300 TPH Silver-Lead-Zinc Ore Crushing Plant in Chile

  • Home
  • Portfolio
  • 300 TPH Silver-Lead-Zinc Ore Crushing Plant in Chile
This project case showcases a 300 TPH Silver-Lead-Zinc Ore Crushing Plant in Chile designed by Sunwe Crusher to optimize flotation recovery rates. It explains how our heavy-duty jaw crusher and high-performance hydraulic cone crusher successfully reduce complex polymetallic ore to a strict 0-15mm uniform feed size, eliminating ball mill overloading and boosting mineral extraction efficiency for our South American client.Core Equipment: Sunwe Heavy-Duty Jaw Crusher, Sunwe High-Performance Hydraulic Cone CrusherClient Location: Central Region, ChileRaw Material: Complex, Unevenly Hard Polymetallic Silver-Lead-Zinc OrePlant Capacity: 300 TPH (Tons Per Hour)Output Sizes: Strictly Controlled 0-15mm Uniform Feed Size
300 TPH Silver-Lead-Zinc Ore Crushing Plant in Chile

Key Equipment


The Challenge: What the Client Needed

A mining concession in central Chile operated a complex polymetallic site. The raw silver-lead-zinc ore featured uneven hardness levels. Their old crushing system failed to produce a consistent output size.

Oversized rocks frequently overloaded the subsequent ball mills. This bottleneck lowered the overall flotation recovery rates. The client needed a robust primary and secondary crushing setup. The new plant had to ensure a steady 300 TPH flow of fine material.

The Solution: Sunwe Integrated Crushing Line

Sunwe engineered an integrated crushing line to solve the grain-size problem. We customized the system to feed the milling and flotation circuits perfectly.

Step 1: Primary Crushing

Our heavy-duty Jaw Crusher handles the initial big ore reductions. It crushes unevenly hard stones efficiently without mechanical jams. The rugged frame design withstands intense continuous impact.

Step 2: Secondary Fine Crushing

Our high-performance Hydraulic Cone Crusher performs the crucial fine crushing. It uses advanced inter-particle crushing action to shape the stones. This step reduces the rocks down to the required fine sizes.

Step 3: Precise Screening

A high-frequency vibrating screen controls the final product size. It separates the material to meet the strict 0-15mm requirement. The screen returns all oversized ore back to the cone crusher.

Performance Comparison

The table below shows the mill performance before and after installing the Sunwe line.

Key Performance Indicator (KPI)Old Crushing SetupSunwe Crushing SystemNet Improvement
Hourly Output (TPH)220 t/h300 t/h+36.3% Production Boost
Final Feed Size Control0-35mm (Uneven)0-15mm (Strict)100% Uniform Fine Feed
Ball Mill Overload Frequency5-7 Times / Week0 Times / MonthEliminated Overloading
Flotation Recovery Rate81.5%89.2%+7.7% Higher Silver Yield

The Results and Client Value

The Sunwe crushing plant operates flawlessly ahead of the flotation circuit. It delivers a continuous 300 TPH flow of uniform aggregate.

The precise 0-15mm feed size eliminates ball mill overloading completely. This ideal sizing maximizes mineral liberation during grinding. Consequently, the client achieved much higher silver extraction and recovery rates.

“Sunwe integrated crushing line changed our entire process.The strict 0-15mm output size protects our ball mills from damage.Our flotation recovery rates reached an all-time high this month.”— Mr. Eduardo Silva, Plant Metallurgy Director

Why Global Quarry Owners Choose SUNWE

    • Factory Direct Supply: We manufacture all heavy-duty crushers in-house to guarantee quality.
    • Custom Engineering: Our team designs layouts based on your specific circuit requirements.
    • Quick Spare Parts Delivery: We stock premium wear parts to minimize your downtime.
单页询盘表单
Cart
SUNWE

Sunwe Mining Mchinery Co.,Ltd

+86 13236679321
+86 18640535178
info@sunwecrusher.com
No. 83, Development 23 Road, Shenyang Economicand Technological Development Zone, ShenyangCity, Liaoning Province, China